Tankline were commissioned to refurbish a penguin pool where a GRP lining system installed in 2015 had failed. The client required a robust, flexible, and long-lasting solution that could withstand frequent filling and emptying — a routine occurrence every two
Tankline were contacted by a school in the Isle of Man after their swimming pool was forced to close due to a failed GRP liner. The previous contractor had applied GRP directly onto unprepared tiles, which resulted in complete delamination
Tankline was called in to remediate a drinking water tank serving a busy leisure centre. The tank had suffered significant osmosis, leading to blistering, delamination, and ultimately a failed Legionella test — making it a clear health and compliance concern.This